Last seen: 24. April 2024 12:27
Heating is optional and requires a special order, not exactly cheap either. With HV batteries, adding more storage is more complicated due to possible...
You need the DRM board to be installed inside the inverter. Ask your inverter seller and they can provide this with instructions how to install and us...
Depends on the FW, you can try. But it should also work using a port splitter like/p>
no activation needed, but ofcourse you have to connect to the right address (set in inverter as 01 for instance as some devices do not like 00). Fro...
Hi, try using a 3-pin RS485->USB adapter (with ground) like/p>
Hi, what are your float/absorbiton/... settings on Deye battery page 3? I would like to suggest to test the same for a client of ours.
@lithiumjunkie So you are running on Battery voltage or SOC on Deye side?
@lithiumjunkie Where in Battery Monitor can you do that? I am thinking maybe Deye would then see all packs with SolarAssistant also directly connected...
@eugenius You can see preliminary info here:br />It is still not yet available, and some details may change.
@elcapo Then it is definitely the motors, test one by one and see which one is the culprit. You can also measure then the effect and try to set the gr...
@elcapo Any fault codes registered in Deye? The motors could be drawing more power at startup, than the Deye can provide for instance.
Hi. So you are saying it works with using V control but not with lithium mode? I have not experienced the same with my own older setup with Seplos BMS...
@osolarmio Hi. Reasoning shortly is on one hand related to the power of the inverter and charge/discharge rate and on the other also the PV input/dail...
Before the DEYE brand batteries, we built Seplos-EEL 280ah 16s packs. Seplos does not balance well, none of the passive BMSs do... so we use NEEY 4th ...